Owner unit | Project name | Participation percentage | Is it completed on time? |
Shandong Everbright International (Jinan) Environmental Protection Power Plant | Everbright International (Jinan) Environmental Protection Power Plant Preventive Test and Instrument Calibration Project | 100% | Yes |
Linzi Maoye Times Square | Cable head production and installation and debugging of high-voltage electrical equipment | 100% | Yes |
Zibo Lingzi Thermal Power Co., Ltd. | Electrical Equipment and Line Handover Test of Booster Station of Baoshan Power Plant | 100% | Yes |
China Resources New Energy (Datong) Wind Energy Co., Ltd. | Shengfengling Wind Farm Electrical Equipment Preventive Test and Relay Protection Safety Automation Device Regular Inspection Technical Service Project | 100% | Yes |
Datang Shandong Electric Power Maintenance Operation Co., Ltd. | Datang Shandong Electric Power Maintenance Operation Co., Ltd. 2016-2017 wind farm regular inspection oil quality test, instrument test, relay protection maintenance project | 100% | Yes |
China Resources New Energy (Nantong) Wind Energy Co., Ltd. | CR New Energy provides 110kV substations and outgoing lines, 35kV collector lines, preventive tests, regular maintenance, and inspection technical services for Dongling Wind Farm. | 100% | Yes |
Zibo Shanshui Cement Co., Ltd. | Zibo Shanshui Cement Preventive Test Project | 100% | Yes |
Zibo Qilin Electric Power Engineering Co., Ltd. | Jinling Iron Mine 110kV Tieshan Station Main Transformer Replacement and Electrical Equipment Test Project | 100% | Yes |
Zibo Shanshui Cement Co., Ltd. | Zibo Shanshui Cement Co., Ltd. 110kV station preventive test, replacement of arrester, installation of latch | 100% | Yes |
Jinan Thermal Power Co., Ltd. | Jinan Lianhuashan Heat Source Plant electrical protection fixed value, high voltage switchgear, transformer and other electrical equipment test projects | 100% | Yes |
Shandong Donghua Cement Co., Ltd. | Shandong Donghua Cement Co., Ltd. 110KV system electrical preventive test | 100% | Yes |
Shandong Jinding Mining Co., Ltd. | Shandong Jinding Mining Co., Ltd. 2016-2017 preventive test of high-voltage electrical equipment | 100% | Yes |
Sinopec Qilu Petrochemical Company | Qilu Petrochemical 110Kv C transformer protection technical transformation and 35KV east first transformer test debugging | 100% | Yes |
China Resources North Region | China Resources New Energy's Linfen Fushan Yingfengling Wind Farm and Ruifeng Wind Farm electrical equipment preventive test and relay protection and automatic device regular inspection technical services | 100% | Yes |
China Resources Central China Region | China Resources Taoyuan Wind Farm and Tianhekou Wind Farm Project Preventive Test | 100% | Yes |
Guohua Shandong Branch | Guohua Qixia, Rongcheng Phase 1-5, Zhucheng, Jiaonan Wind Farm Booster Station and Box Transformer Maintenance Pre-Test Project | 100% | Yes |