EN
EN

The Photovoltaic Project in the Factory Area Started Smoothly

2022. 05. 03 72
Share:

mmexport1650512968944.jpg

With the rapid development of the global photovoltaic industry, in order to create a green factory, a green environment, and the corporate vision of serving a better life, the company uses the open space in the factory area (the open space on the west side of the complex building) to build a distributed photovoltaic power generation project, which can be directly connected to the 380v power plant. system, self-use. The project officially entered the first pile on April 20, marking the smooth start of the second phase of the company's photovoltaic project. During the construction period, the comrades worked overtime, in order to light up the green economy, overcome difficult factors such as hot weather and epidemic prevention and control, ensure construction safety and project quality, stick to the front line of the project, and stay with the soil. It is of great significance to reduce the cost of electricity consumption and improve the operating efficiency of enterprises.

  • Prev
  • Next
  • Service
  • Message
  • Online Service