EN
EN

Philippines Project

2022. 06. 11 72
Share:

1524613832113513.jpg

1524613833321447.jpg

    The PCPC Power Plant in the Philippines is equipped with Alstom 45MW-135MW units for the Wuxi 430t/h fluidized bed furnace, which was put into commercial operation in August 2016. Due to the small capacity of the local power grid, the unit is a peak-shaving unit, with a load variation of 48MW to 135MW and a frequency of 60Hz. On behalf of TUV Philippines, our company assists Filipino owners to do a good job in supervision, audit, suggestion, planning, etc., and submit reports, suggestions and plans within the time specified by the owner.

  • Prev
  • Next
  • Service
  • Message
  • Online Service