The total installed capacity of Linyi Yishui Wind Farm is 49.8MW, equipped with 25 XE105/100-1.8-2.0MW wind turbines, and the grid-connected voltage is 220KV. The grid-connected time is August 2014. The voltage level of the booster station is 220KV/35KV. After winning the bid, according to the requirements of the owner, the electrical equipment of the booster station of Yishui Wind Farm, the 220KV transmission line, the operation management of the 35KV collector line (inspection, elimination, and troubleshooting), regular maintenance, cleaning and anti-corrosion, and prevention were completed with high quality. The test work has been well received by the owners.