Warning: file_put_contents(/home/hqtebhyqbtoe/wwwroot/en/data/cache/license_cache.php) [function.file-put-contents]: failed to open stream: Permission denied in /home/hqtebhyqbtoe/wwwroot/en/source/model/api.class.php on line 215
Power station operation and Maintenance-Shandong Hongqiao Thermal Power Co., Ltd.
EN
EN

1512035110113935.png  1512036112814118.png  

       Turkey's Karabiga power plant unit #1 ready to enter full load                        The #1 unit of the Karabiga Power Plant in Turkey was handed over to the owner, 

                                                                                                                                               the ignition and start-up were successfully completed, and our personnel continued 

                                                                                                                                                                                              to provide technical guidance

1512036398802714.png  1512036405974540.png  1512036411129220.png

      Indonesia Palembang project technical personnel          The technical personnel of the Indonesian Palembang         Zambia's Maamba Power Station #2 unit was officially 

         guide the owner's personnel DCS supervision              project guide the owner's personnel on the operation                                handed over to the owner         

                                                                                                               essentials of electrical equipment

  • Service
  • Message
  • Online Service